Construction Update
Footpath Closure:
Part of the footpath and crossing is shut as per the attached mark up for the next approximately 4-6 weeks while we conduct new crossover works on Caribbean and Lakeview drives.
Construction Zone:
8 Caribbean Drive (2024/2025)
Current work is being undertaken in the above location. Heavy equipment is being used to compact clay over the next 2-3 weeks then intermittently after that. There will be smaller amount of mud and gravel on bitumen road from here on out as the truck traffic lessens.
Road Closures:
All roads open other than the below.
- N/A
Traffic Management Plans: